Over the last few weeks we have visited Saugerties Town Hall and filed FOIL requests for copies of documents from the Terramor Public file. Today we have three new documents from various times during the process. We are now up to date with the Public file, at least until July 26th.

From June 30 and received by the Saugerties Planning Board on July 11th, we have a short memo from C.T. Male Associates to Terramor. This technical memorandum provides the preliminary basis of design for the water system at the proposed Terramor Outdoor Resort in Saugerties, Ulster County, New York.
Water Supply Biological Oxygen Demand Report 7-1-22 (136K .pdf)

From July 8 we have Terramor’s application to the Army Corps of Engineers for a Approved JD. Here they are asking the ACOE to approve their wetlands delineation. They enumerate the number and nature of wetlands on site, which are tributaries to the waters of the US, and which are not. This is a highly technical 70 page report featuring maps and particular descriptions of various wetlands on the site.
Terramor Wetlands Delineation Report and AJD Application to Army Corps (25 MB .pdf)

Finally, from July 19th we have the Saugerties Planning Board SEQRA Notice of Intent to become Lead Agency. As discussed at the July 19th meeting, the Board distributed this notice of intent the list of agencies enumerated on the third page.
NOI Saugerties Planning Board – Final 7-19-22 (64 kb .pdf)


From June 6 2022 – Determination Memo to Terramor from Saugerties Building Inspector / Zoning Administrator

Town of Saugerties Department of Safety and Buildings and Zoning



Town of Saugerties Department of Safety and Buildings and Zoning
Where does Terramor’s proposed facility fit within the definition in 235-11-1? Is it a Lodge? Camp? Recreational Park?

Early in the planning process for Terramor, and pursuant to a question about the ways in which Saugerties zoning might affect the Terramor development, Alvah Weeks, the Saugerties Building Inspector and Zoning Administrator, wrote to the developers’ designers and clarified the situation as he saw it then.

This memo is dated June 6 2022 and includes a brief discussion of the AutoCamp project and the ways in which it was affected by the “pre-existing business” aspects of the zoning laws. It also discusses the particular terms about “camps” and determines that the project as proposed fitted in to the category of “Camps and Recreational Vehicle Parks”. The memo then cites parts of the zoning determined to apply here.

Here is a .pdf of the Determination Memo to Terramor from Saugerties Building Inspector / Zoning Administrator : Alvah Weeks Terramor Zoning Determination 6-2-22

Here is a gallery of the Determination Memo to Terramor from Saugerties Building Inspector / Zoning Administrator:

Determination Memo to Terramor from Saugerties Building Inspector Zoning Administrator 6-2-22-page-001

Image 1 of 3

Determination Memo to Terramor from Saugerties Building Inspector Zoning Administrator 6-2-22-page-001


Here are pictures of the Determination Memo to Terramor from Saugerties Building Inspector / Zoning Administrator:
Determination Memo to Terramor from Saugerties Building Inspector Zoning Administrator 6-2-22-page-001
Determination Memo to Terramor from Saugerties Building Inspector Zoning Administrator 6-2-22-page-001

Determination Memo to Terramor from Saugerties Building Inspector Zoning Administrator 6-2-22-page-002
Determination Memo to Terramor from Saugerties Building Inspector Zoning Administrator 6-2-22-page-002

Determination Memo to Terramor from Saugerties Building Inspector Zoning Administrator 6-2-22-page-003
Determination Memo to Terramor from Saugerties Building Inspector Zoning Administrator 6-2-22-page-003

Here is the text of the Determination Memo to Terramor from Saugerties Building Inspector / Zoning Administrator Alvah Weeks.  The formatting may be off and we include the text here mainly for search reasons.
— starts —
 
June2, 2022
The LA GROUP Landscape Architecture and Engineering, P.C.
40 Long Alley, Saratoga Springs, NY 12866

Re:  Where does Terramor’s proposed facility fit within the definition in 235-11-1? Is it a Lodge? Camp? Recreational Park?

Mr. Franke,
The Auto Camp project was purchased as a Pre-existing business established by the original owners the Moretti Family during the beginning of Town Zoning. The Town Zoning Law was adopted in 1989 and amended said law in 2008 which includes Sub Section 245-43 “pre-existing Business”. The project was able to expand its existing usage of open space as provided in Sub Sec 245-43 Pre-existing Businesses [C] (1) (B) provided.

Although our Zoning Law is very ambiguous when it comes to transient usage (Hotels, Motels, Lodges, Camps, Short Term Rentals – Air B&B’S) and our Zoning Law Definitions and Schedule of District Use Regulations ($ 245-10) is being scrutinized and revised at this time, the Building Department has determined that the Terramor’s project is clearly defined in the Osha’s Standard Industrial Classification Manual referenced in our Zoning Law in Description # 7033 & 7032, “Camps and Recreational Vehicle Parks”. If I can be of further assistance, please do not hesitate to contact my desk directly at (845) 246-2800 Ext. 332.

Respectfully submitted,

Alvah L. Weeks, Jr. Building Inspector / Zoning Administrator

$ 245-43. Preexisting businesses.

A. This chapter is not intended to restrict the rights of businesses which were in existence at the time of completion of the list of pre-existing businesses developed after the enactment of the Zoning Law of 1989 to continue indefinitely and to expand in accord with the standards or procedures set forth below.

B. Expansion of pre-existing business. Any expansion of an existing building, erection of a new building, or increase of the lot area used by a pre existing business, as permitted within this section, shall be subject to the bulk and area standards of the most restrictive district in which the business is permitted by right in the use schedule. 2) In the event a use is only permitted subject to a special use permit, the standards of the most restrictive district in which such a permit applies shall be used. The new or expanded areas shall also comply with the parking and loading standards established for the use.

(1)

C. Procedures for expansion. Expansion of a pre-existing business in accord with the standards of this chapter is governed by the following procedures: (1) Expansion by right. A pre-existing business may expand as a matter of right to the extent set forth in this chapter. Approval of a site plan shall only be required if the expansion exceeds any of the limits set forth in this chapter. (a) The floor area used or occupied by a preexisting business at the time of enactment of this chapter may be increased by 100% or 2,000 square feet, whichever is more; (b) The open lot area used or occupied by a preexisting business at the time of enactment of this chapter may be increased by 100%; and (c) If no building existed at the time of enactment of the Zoning Law of 1989, a new building with no more than 2,000 square feet of floor area may be erected. (2) Additional expansion. Expansion in excess of the limits in Subsection C(1) shall be allowed by permission of the Zoning Board of Appeals. In making its determination, the Board shall consider the effect of such expansion on adjacent properties and the surrounding neighborhood in terms of traffic circulation, access for fire, police and emergency vehicles, and the general health, safety and welfare of nearby residences. The Board may only deny such a permit upon a finding that the expansion will have a significant adverse effect on such factors. D. Transfer of rights. All rights established in this section shall automatically be transferred to all future owners of the property on which the business is located.

Standard Industrial Classification (SIC)

Description for 7033: Recreational Vehicle Parks and Campsites

Division 1: Services | Major Group 70: Hotels, Rooming Houses, Camps, And Other Lodging Places | Industry Group 703: Camps And Recreational Vehicle Parks

7033 Recreational Vehicle Parks and Campsites Establishments primarily engaged in providing overnight or short-term sites for recreational vehicles, trailers, campers, or tents. Establishments primarily engaged in operating residential trailer parks are classified in Real Estate, Industry 6515.

Campgrounds Campsites for transients Recreational vehicle parks Trailer parks for transients

Description for 7011: Hotels and Motels

Division f: Services | Major Group 70: Hotels, Rooming Houses, Camps, And Other Lodging Places | Industry Group 701: Hotels And Motels

7011 Hotels and Motels Commercial establishments, known to the public as hotels, motor hotels, motels, or tourist courts, primarily engaged in providing lodging, or lodging and meals, for the general public. Hotels which are operated by membership organizations and open to the general public are included in this industry. Hotels operated by organizations for their members only are classified in Industry 7041. Apartment hotels are classified in Real Estate, Industry 6513; rooming and boarding houses are classified in Industry 7021; and sporting and recreational camps are classified in Industry 7032.

Auto courts Bed and breakfast inns Cabins and cottages Casino hotels Hostels Hotels, except residential Inns, furnishing food and lodging Motels Recreational hotels Resort hotels Seasonal hotels Ski lodges and resorts Tourist cabins Tourist courts

7032 Sporting and Recreational Camps Establishments primarily engaged in operating sporting and recreational camps, such as boysand girls’ camps, and fishing and hunting camps. Establishments primarily engaged in operating sports instructional camps, such as baseball, basketball, football, or karate camps, and those operating day camps are classified in Industry 7999.

Boys’ camps Camps, sporting and recreational

Dude ranches

Fishing camps

Girls’ camps

Hunting camps

 Nudist camps

 Summer camps, except day and sports instructional

— ends —

Saugerties Planning Board Consultants make initial comments about Terramor SUP application

Nelson Pope Voorhis consultants to Saugerties Planning Board logo

Nelson Pope Voorhis consultants to Saugerties Planning Board logo
The Saugerties Planing Board employs outside consultants as a matter of course. The company is called Nelson Pope Voorhis and the consultant primarily concerned with Saugerties is Adriana Beltrani. You can see the consultant’s very earliest comments about Terramor from months ago here

The consultant’s July 11th report is quite technical, with many references to Town code and State laws. There is also discussion of the schedule of Planning Board actions in the process. Some questions raised were answered at the July 20th meeting (tent capacity, opening season), others remain to be answered. The developers will soon write back to the Board about specific issues raised herein.

Here is a .pdf of the consultant’s Memorandum to the Planning Board about the Terramor SUP Site Plann Application:
NPV Consultants Review-Terramor-7-11-22

Here is a gallery:

NPV Review-Terramor-7-11-22-page-001

Image 1 of 8


Here are pictures:
NPV Review-Terramor-7-11-22-page-001
NPV Review-Terramor-7-11-22-page-001

NPV Review-Terramor-7-11-22-page-002
NPV Review-Terramor-7-11-22-page-002

NPV Review-Terramor-7-11-22-page-003
NPV Review-Terramor-7-11-22-page-003

NPV Review-Terramor-7-11-22-page-004
NPV Review-Terramor-7-11-22-page-004

NPV Review-Terramor-7-11-22-page-005
NPV Review-Terramor-7-11-22-page-005

NPV Review-Terramor-7-11-22-page-006
NPV Review-Terramor-7-11-22-page-006

NPV Review-Terramor-7-11-22-page-007
NPV Review-Terramor-7-11-22-page-007

NPV Review-Terramor-7-11-22-page-008
NPV Review-Terramor-7-11-22-page-008

Here is the text of the NPV Consultant’s Memo to the Saugerties Planning Board about the Teramor SUP Site Plan Application. Formatting is a little off. We add the text here mostly for search reasons.

MEMORANDUM
TO: Howard Post, Planning Board Chair
Members, Saugerties Planning Board

FROM: Adriana Beltrani, AICP  
Max Stach, AICP

Terramor Catskills; SBL 27.2-8-28/32.110
DATE: July 11, 2022
CC: Kevin Franke Applicant Representative
Ahmed Helmi, Applicant Representative
Becky Bertorelli, Planning Board Clerk
Alvah Weeks, Building Inspector
Dennis Larios, P.E., Town Engineer

We are in receipt of the following items:

Determination from Alvah Weeks, Building Inspector, dated June 6, 2022;

Cover Letter prepared by Kevin Franke, dated July 1, 2022;

Site Plan Application not signed, dated July 1, 2022;

Responses to NPV Sketch Plan Comments, prepared by Kevin J. Franke, dated July 1, 2022; Site Plan Set, 86 sheets dated July 1, 2022 including:  

o Boundary Survey prepared by Ausfelt & Waldruff Land Surveyors, LLP  

o Landscape Plans including Existing and Proposed Conditions, Grading and Drainage, Road  Profiles, Lighting, Materials and Planting Plan, prepared by the LA Group  

o Architectural Drawings prepared by Design Group Collaborative

o Sewer and Water Engineering Plans Prepared by C.T. Male Associates

Lighting Cut Sheets, 37 sheets dated July 1, 2021

Full EAF Part 1 prepared by Kimberly White, dated July 1, 2022

Ground Water Sampling Results prepared by ALPHA Geoscience dated December 21, 2021 Traffic Impact Study prepared by GPI, dated June 2022

Stormwater Pol

Wastewater Basis of Design Report

Water Supply Basis of Design Report

We previously reviewed additional documents, enumerated in our March 11, 2022 memorandum.

The applicant seeks site plan and special use permit approval for a 75 unit “glamping” campground including a  wellness center, activity lawns, swimming pool, lodge and facility operations including a maintenance facility,  golf cart storage and on-site employee housing. The project is proposed on two (2) parcels totaling 77.51 acres  in the Moderate Density Residential (MDR) zoning district. The applicant proposes to gain primary access from  Route 212 with emergency access via Cotton Tail Lane.

We have been as thorough as possible in our review but given the size of this submission and time allotted to  review, it is likely that we may have additional comments as the planning and review process proceeds. Our  comments are as follows:

Terramor Catskill July 11, 2022

Process 

1. The Lead Agency Notice of Intent for this Type I action should be circulated along with the Full EAF Part  1 form and a copy of the application. Due to the voluminous size of the application, the Board may  wish to send flash drives or provide a link to the document posted online in lieu of paper copies. If so,  the Lead Agency NOI should indicate how involved and interested agencies may request paper copies.  

a. The Board must wait 30 days to assume Lead Agency status and proceed with SEQR review, as  detailed below.  

2. Ulster County Planning Board review is required. The plans and required forms should be submitted at  this time.  

3. The project site borders the Town Boundary with the Town of Woodstock. Pursuant to GML §239-nn,  the clerk of the Town will need to receive written notice of the public hearing for this application. We  suggest including the Town of Woodstock as an interested agency for SEQR review.  

4. Comment or correspondence should be solicited from the following organization or agencies in  addition to any others identified by the Planning Board:

a. Centerville Fire Department

b. NYS DEC regarding disturbance to wetlands and waterbodies, wastewater (SPDES), biodiversity  and bulk petroleum storage

c. US ACOE for jurisdictional determination of wetlands, possible disturbance permits d. NYS DOT for curb cut permit and sight distance review

e. UC DOH/NYS DOH for public water supply and wastewater permitting, campground permitting,  public swimming pool permitting

f. Town Engineer for SWPPP, water/wastewater and site plan review.  

5. The Board should consider engaging with a traffic engineer to review the Traffic Impact Study.

6. The Board may wish to forward the plans, particularly the architectural drawings, to the Building  Department for Building Inspector review to ensure that applicable codes are met which might relate  to the site plan and layout (see comments below).

7. A public hearing will be required for special use permit review.  

Application 

1. The applicant proposes to merge the two parcels as part of the application, a subdivision application  will be required and should be coordinated through the Planning Board secretary.

2. The application forms must be signed by the preparer.

Planning & Zoning 

3. In issuing a Special Use Permit, the Planning Board must consider the supplemental requirements set  forth in the zoning code and can request additional studies or analyses to support its review. Based on  our review, specific consideration of the following provisions is warranted:  

§245-34.D states:

a. (g) Smoke. No emission shall be permitted of a shade equal to or darker than Ringelmann  Smoke Chart No. 2.

b. (h) Odors. No emission of odorous gases or other matter shall be permitted in a quantity or of a  type that permits it to be detectable, other than by instrument, at the property line. c. (i) Other forms of pollution. No emission of fly ash, dust, smoke, vapors, gases or other forms of  air pollution shall be permitted which can jeopardize human health, animal or vegetable life or  which otherwise contributes to the deterioration of or detracts from adjacent properties. d. (o)Character and appearance. The character and appearance of the proposed use, buildings,  structures, outdoor signs, and lighting shall be in general harmony with the character and  appearance of the surrounding neighborhood and of the Town of Saugerties and shall not  adversely affect the general welfare of the inhabitants of the Town.

e. (q) Sewage treatment and water supply. The adequacy of available sewage disposal and water  supply services supporting the proposed activity or use shall be sufficient to meet the needs of  the proposed activity or use. This consideration shall include, but not be limited to, the  suitability of water supply and sanitary sewage facilities to accommodate the intended use and  adequate means to protect surface and groundwater from pollution.

f. (s) Nuisances. The proposed use shall not be more objectionable to nearby property owners or  occupants by reason of noise, fumes, vibration or lighting than would be the operations of a  permitted use.

g. (v) The design of structures and the operation of the use (including hours of operation) shall  ensure compatibility with surrounding uses and with the scenic and visual characteristics of the  Town.

§245-11.I includes the following paraphrased considerations: 

h. The Planning Board shall consider the following: Overcrowding of units; and the extent to  which noise or light interferes with the use and enjoyment of surrounding properties.  

4. Campsites are now proposed along the western boundary of the site which are located near to existing  residences and residential lot lines. A field investigation conducted on June 7, 2022 showed these sites  are clearly visible from these existing residences. While forest cover is shown on the plans as a buffer,  the forest cover actually lacks significant understory, consistent with mature eastern hemlock forests.  At least 7 or 8 tent sites depict fire pits situated between the tent site and the property boundary. With  the proposed design, a fire is likely to be visible from the existing residences and woodsmoke (both  smell and visible smoke) could carry over to adjoining residential parcels. (See below image which  depicts a residential structure from a camp site proposed at the time.)  

i. The applicant should suggest methods to ensure that these sites meet the above referenced  special permit standards with relation to screening and buffering campsites and campfires from  adjacent residences.

< image missing>

5. An inventory of buildings on the site should be provided on the Project Master Plan Sheet L-2.0  indicating the name of the building, gross building square footage and/or seats, beds or maximum  occupancy for staff and guests. In addition, the ‘Woody 35’ and ‘Woody 45’ sized tents should be more  clearly indicated on the plans. Currently the only enumeration of the number and breakdown of  campsite types is within the Water Supply BOD report. If these tents are intended to be  interchangeable, the Planning Board may wish to establish limitations on the total number of the larger  tent to reflect the water use/wastewater generation and traffic studies.  

6. The comment response letter states that the maximum capacity of a Woody 35 tent is 6 people and for  a Woody 45 tent is 8 people. This equates to a capacity of 510 guests at the facility. The Water and  Wastewater Basis of Design Reports indicate that the maximum capacity of the campsites is 240, which  vastly underrepresents the possible worst-case scenario.  

j. It seems that these lower numbers are based on average occupancy rates from the Bar Harbor site. We question whether this Bar Harbor site is representative of the proposed site in terms  of market economics and demographics.  

k. We defer to the Town Engineer on what standard to design a water or wastewater system, but  to meet the hard-look requirement under SEQR, a “reasonable worst-case standard” should be  utilized, which would be related to full occupancy, or if full occupancy is not reasonably likely to  occur, then some percentage of full occupancy that is reasonably likely to occur. The Planning  Board may wish to impose an occupancy restriction based on the capacity outlined by the  applicant to establish environmental determinations and/or findings, and for the wastewater  and potable water facilities.

7. We question whether traffic impacts from this resort campground should be assessed as a traditional  campground/RV park or as a resort hotel. We suggest that the Planning Board engage with a Traffic  Engineer to review this and other traffic related questions.  

8. Sheets A213, A214. The arrangement of beds for guest tents should be shown on the architectural  plans, and it should be indicated whether these beds are single or bunk beds. We note that “Tent 2”  (we assume this is the Woody 45 model) has two bedrooms while “Tent 1” has one bedroom. It  appears that an indoor and an outdoor shower is proposed for each unit-this should be confirmed.  

9. The capacity of employee housing does not match between the architectural drawings, the water and  wastewater BOD reports, the comment response letter or the EAF project description. The BOD report  states that 6 dorm units are proposed for 30 workers. This would require five beds per dorm building.  Dorm buildings depicted on sheet A210 show 3 beds. If these represent bunk beds, then 36 employees  can be accommodated with 6 to a dorm building.  

l. Further, the comment response letter states that 4 structures are proposed to house 5  employees each, and 2 structures are proposed with a capacity for 4 employees each.  Sheet A212 depicts the studio units with two rooms each containing a full-sized bed. We  assume that these are the 2 structures proposed to house 4 employees each. Is this housing for  couples only?

m. The number of Dorm and Studio units must be called out on the Master Plan Sheet L-2.0.  

10. The BOD report indicates that the General Manager’s House contains bedrooms, but three bedrooms  are shown on the Architectural Drawings. Are these bedrooms intended to house employees or family  members? The Planning Board may wish to limit occupancy to only the manager and/or their family,  especially if water and sewer usage for this building is based on a single family detached residence.  

11. The number of residential and non-residential employees and/or non-employee residents should be  established. The comment response letter states that 42 employees are anticipated, split into two  shifts. The letter totals 28 on-site employees, while the architectural drawings and BOD report indicate  up to 48 individuals could be accommodated within the dorm and studio units. This calculation does  not include the General Manager’s House, as the capacity of this building is not clear (comment #8).

12. The single kitchen provided does not appear to be large enough to support between 24-42 residential  employees, especially if meals are prepared individually by residents at mealtimes. Please verify that  the single kitchen devoted to these employees is enough.  

13. The Building Inspectors should review the site, building and floor plans to ensure compliance with the  Americans with Disabilities Act (ADA) and other applicable building codes that could impact site design.  We believe this may be a concern with regard to employee housing as depicted in the architectural  plans.  

14. We have counted 168 parking spaces. A parking calculation reflecting the maximum capacity of the  resort should be included on the site plans which differentiates guest parking from employee parking.  The Planning Board shall determine the appropriate number of parking spaces (245-29(a)).  

15. From where will firewood be sourced? Please verify that all firewood will comply with NYS DEC  requirements of 6 NYCRR 192.5.

16. Seasonality. The timing of activities and occupancy of the site must be clarified. Is the General Manager  on site year-round? Are events proposed to take place during a full 12-month period or only from May October?  

17. Dumpsters should be called out on the plans.  

18. We note that 2-3 box truck deliveries could occur per day. Is this anticipated year-round? Where and  when are these deliveries received? It appears that loading space is accommodated only at the  maintenance buildings and the Lodge.

19. Is the restaurant at the lodge open to the public or to guests only?  

20. While the notes sheet lists a diversity of plantings, the landscape plans indicate only the type of  planting proposed (evergreen tree, deciduous tree etc). More detail should be submitted regarding  landscaping given the ecological importance of the site.  

21. Three (3) propane storage tanks are proposed totaling 30,000 gallons – is each tank 10,000 gallons?  These should be clearly marked on the site plans. Liquid propane stored on site must demonstrate  compliance with 6CRR-NY 613-4.1. The applicant should submit drawings, construction details and a  narrative or correspondence with NYS DEC that demonstrates propane tanks are protective of sensitive  receptors referenced in the law. (Law section linked here)  

22. We defer review of the erosion and sediment control plans, grading plans, road profiles, construction  details, water and wastewater concept plans and the SWPPP to the Town Engineer.  

SEQR/Environmental Review 

23. This is a Type I action under SEQR as more than 10 acres is proposed to be physically altered. The Board  should classify the action and notice its intent to assume Lead Agency (a draft NOI is attached). The  Board must allow involved agencies 30 days to contest Lead Agency before taking any further SEQR  action.  

24. In general, all correspondence with agencies and studies conducted should be provided to the Planning  Board. This includes letters or correspondence with the NYS DEC and NYS Department of Health. The  wetland delineation report should be provided along with the request for jurisdictional determination. It is typical for State agencies to provide formal letters upon receipt of the SEQR NOI.  

25. The Ducks Unlimited wetland mitigation program is a new program in the State of New York. It is  unclear if this program has even been authorized at this time. We request documentation from NYS  DEC to confirm that this is a feasible and appropriate mitigation. The applicant should also provide the  Board with additional information about the Ducks Unlimited program, and its applicability in the State  of New York.  

26. We have reviewed the long EAF Part 1 and have the following comments:

a. C.2.c- The project site is part of an “Important Natural Area”, within the Catskill Mountain  physiographic area, Map 2, of the Open Space Plan. Further, the Open Space Vision Map calls  out this physiographic area, including the project site. The response to this question should be  “yes.”

b. D.2.b- We note that 19.13 acres are proposed to be disturbed. We defer to the Town Engineer  and NYS DEC in the review of the SWPPP. This should be reconciled with the land cover  changes indicated in Table I.1.a which indicate the reduction of only 5.0 acres of wetland and  forest. Since almost the entirety of the existing site is forest and wetland it is difficult to  reconcile without further explanation.  

c. D.1.e- We note that the proposed project will be conducted over the course of a 14-month  period. Construction phasing or sequencing should be discussed.

d. D.2.f- Regarding employee housing, clarification is needed and water/wastewater calculations  must match the actual proposed accommodations on site.

e. D.2.g- Please ensure that architectural drawings match EAF. The lodge appears to be 111 feet  long on plans.

f. D.2.b- See above discussion of Ducks Unlimited mitigation. In addition, part ii is left blank  where the applicant proposes stream disturbances. The extent and nature of the stream  disturbances should be explained, even if temporary. NYS DEC permits may be required for  disturbances to the bed or banks of Class B streams, ie “protected streams.”

g. D.2.c, d- We note that the water and wastewater calculations may not be based on the  maximum capacity of the facility per above comments.  

i. In addition, a SPDES permit will be required from NYSDEC to discharge effluent from  the proposed wastewater treatment plant into a protected, Class B stream.

ii. We note that 5 acres of impervious surface is proposed as a result of this project and  defer a review of stormwater management practices to the Town Engineer.

h. D2j- The number of parking spaces does not match the number we counted on the plans, this  should be confirmed (166 or 168?). Please see our comments regarding the TIS and parking  above.

i. D2j- EV charging stations are proposed, these must be shown on the site plans. j. D2k- Please confirm the estimated annual electricity demand. The response is missing a zero or the comma is incorrect. A willingness to serve letter from the local utility should be provided. i. Does this calculation include the proposed EV charging stations?

k. D2o- We note that wood campfires are to be permitted at all hours. This may produce odors  for more than one hour per day.

l. D2p- See above comment referencing bulk storage of liquid propane.

m. D2q- Treatments are proposed for mosquito and tick control 2-3 times per year. Information  regarding the chemicals proposed, application methodologies, safety, hazards and any required  permits must be provided.  

n. E1h- We defer to the Town Engineer regarding water quality assessment.

o. E2h- The project site is within five miles of Big Indian Wilderness and Overlook Mountain. This  response should be “yes.”

27. Based on a review of the Part 1 EAF, we have provided the Board with a draft Part 2 EAF to review. The  Part 2 cannot be adopted until the Board declares Lead Agency, 30 days from circulation of the  attached NOI. The Part 2 identifies the following potential impacts, to be reviewed and confirmed by  the Board at the next meeting:

p. Impacts on Land
q. Impacts on Surface Water
r. Impacts on groundwater
s. Impact on Plants and Animals
t. Impact on Agricultural Resources
u. Impact on Open Space and Recreation
v. Impact on Transportation
w. Impact on Noise, Odor and Light
x. Impact on Human Health

Further Review is needed by the Planning Board to determine whether the proposed action may  impact the following:  

y. Consistency with Community Plans (see comment 28)
z. Consistency with Community Character (See comment 29)

28. When considering the proposed action’s consistency with Community Plans, the Board should consider  whether this project is consistent with the Town of Saugerties 2020 Comprehensive Plan. In particular,  NYS DEC guidance states: “How do the vision and goals described in these plans compare with various  elements of the proposed project? Do any elements of the proposed project conflict with the vision,  goals, and strategies outlined in any of these adopted plans?”

aa. We have attached pages from the Comprehensive Plan that enumerate recommendations  related to Land Use and Development (#6), Economics (Diversify Economic Base, Goal #9) and  Tourism (#13). The following are the goal statements:

i. #6: “The Town and Village support, and encourage, planning policies that promote  environmentally sound development (see Glossary) in all zoning districts and are  responsive to the socioeconomic needs of the communities. These two factors must be  balanced. The open spaces and rural aspects of the area are not replaceable, and any  development should be well thought-out and planned with the future in mind. The  Comprehensive Plan also seeks to strike a balance between open space conservation  and economic development as stated in the Open Space Plan.”

ii. #9: “The Town and the Village should attempt to diversify its economic base by  encouraging a variety of business and employment opportunities.”

iii. #13: “Promotion of tourism will be well-planned to maximize its economic benefit to  the community. Tourism is important to many town businesses. In promoting tourism  and it benefits, the community must consider the potential impacts of tourism  

development, such as additional parking demands, increased traffic, and pollution.”

29. When considering the proposed action’s consistency with Community Character, the Board should  consider the following NYS DEC guidance:

bb. “Community character is defined by all the man-made and natural features of the area. It  includes the visual character of a town, village, or city, and its visual landscape; but also  includes the buildings and structures and their uses, the natural environment, activities, town  services, and local policies that are in place…Changes to the type and intensity of land use,  housing, public services, aesthetic quality, and to the balance between residential and  commercial uses can all change community character.”

— ends —

Initial legal and engineering letters to Saugerties Planing Board about Terramor Overdevelopment

Lawyer with briefaces Terramor Overdevelopment

Lawyer with briefcase Terramor Overdevelopment
Just before the Saugerties Planning board meeting of July 19th, at which Terramor made their first presentation of their SUP application, two letters were delivered to the Board. One was from a lawyer retained by a number of local residents and neighbors to the Terramor project. The second letter was from a consultant engineer hired by the lawyer.

These letters lay out specific issues with the Terramor application as filed July 1st. The first question is whether the planned development is even permitted in this locale, SUP or not.

The lawyer’s letter asks several questions which Terramor has already given answers for. Obviously, there are plenty more. This is the start of a long process.

Here is a .pdf of the Lawyer’s Letter to Chairperson of Town of Saugerties Planning Board 7.19.22
And here are pictures:

Lawyer's Letter to Chairperson of Town of Saugerties Planning Board 7.19.22-page-001
Lawyer’s Letter to Chairperson of Town of Saugerties Planning Board 7.19.22-page-001
Lawyer's Letter to Chairperson of Town of Saugerties Planning Board 7.19.22-page-002
Lawyer’s Letter to Chairperson of Town of Saugerties Planning Board 7.19.22-page-002
Lawyer's Letter to Chairperson of Town of Saugerties Planning Board 7.19.22-page-003
Lawyer’s Letter to Chairperson of Town of Saugerties Planning Board 7.19.22-page-003

The letter from the engineer to the lawyer lays out several issues that come up in an initial review of the Terramor SUP application as filed July 1st. Many areas of concern are identified. This work will continue.

Here is a .pdf of the Engineer’s 2022-07-19 Terramor Initial Project Review_ltr-redacted
And here are pictures:

Engineer-2022-07-19 Terramor Initial Project Review_ltr-redacted-page-001
Engineer-2022-07-19 Terramor Initial Project Review_ltr-redacted-page-001
Engineer-2022-07-19 Terramor Initial Project Review_ltr-redacted-page-002
Engineer-2022-07-19 Terramor Initial Project Review_ltr-redacted-page-002

Engineer-2022-07-19 Terramor Initial Project Review_ltr-redacted-page-003
Engineer-2022-07-19 Terramor Initial Project Review_ltr-redacted-page-003
Engineer-2022-07-19 Terramor Initial Project Review_ltr-redacted-page-004
Engineer-2022-07-19 Terramor Initial Project Review_ltr-redacted-page-004

Here is the text of the lawyer’s letter to the Saugerties Planning Board about the Terramor SUP application:


July 18, 2022

VIA EMAIL (chowardpost@gmail.com)

Mr. C. Howard Post, Chairperson
Town of Saugerties Planning Board
4 High Street
Saugerties, New York 12477

Re: Terramor Catskills Glamping Project Proposal

Dear Mr. Post,

This office represents several residents who have serious concerns about and objections to the pending Terramor Glamping Proposal (the “Terramor Proposal”) currently pending before your Board. It is our understanding that the proposal has substantial opposition, which is not surprising as the project is inconsistent with the Town of Saugerties Zoning Code and the requirements of the MDR Moderate-Density Residential District (the “District”).

As the Board is aware, the District is intended to preserve the area’s rural environment and all the benefits that go along with that, while living relatively close to compatible and interdependent land uses where County and State highways are easily accessible. The definition of the District provides that small-scale convenience businesses designed to serve the adjacent residential population and certain cultural, educational, and recreational uses compatible with a rural environment may also be permitted, subject to conditions designed to protect the residential character of the District.

As you may be aware, the Town and Village of Saugerties Comprehensive Plan 2021 Update identified housing concerns in the MDR and LDR districts. Based upon The Town of Saugerties Open Space Plan limited build out analysis, the density permitted in the MDR and LDR districts is likely to compromise the integrity of important natural and agricultural resources, could have significant impacts on the
town’s natural resources, agricultural resources, scenic views, biodiversity, and rural and historic character. It could also result in economic impacts due to increased costs of services to town taxpayers. See Town and Village of Saugerties Comprehensive Plan 2021 Update
Page 11.

The Terramor Proposal is clearly a threat to the density permitted within the MDR district. According to the Terramor Full Environmental Assessment Form, the Terramor Proposal seeks a permit for a 75-tent glamping campground. These are not ordinary tents that are temporary in nature and can easily be taken down, but rather tents constructed of hard and soft canvas materials situated on a wooden foundation or platform that are permanent in nature. These tents are luxury dwelling analogous to mobile homes, not to be confused with recreational vehicles. The tents will have running water, septic and electricity and are designed to be permanent structures. The Terramor Proposal also proposes multiple additional permanent structures consisting of a proposed lodge that will provide food and beverage services for resort guests, not housing; a swimming pool area; an event lawn pavilion; a wellness tent; a manager’s residence; multiple-family homes for employee housing; and several parking lots. All in all, there will be approximately 90 permanent structures constructed on the premises, which will service up to 480 people on site at a time. In addition to camping activities, the Terramor Proposal’s proponents have proposed to use the site as a venue for weddings and special events.

The sheer size, scope and multiple uses of the Terramor Proposal are inconsistent with the nature of the MDR Moderate-Density Residential District and the concerns expressed in the Comprehensive Plan 2021 Update. As the Board is aware, the projects outlined in the Terramor Proposal are not permitted uses within the MDR Moderate-Density District. As a result, Terramor has applied for a Special Use Permit and Site Plan Approval pursuant to the Town of Saugerties Schedule of District Use Regulations, under Lodging Places. Therein, Lodging Places is defined as having a lodge (50 maximum units), camps and recreational parks. Neither lodge or camps are defined, nor does the Special Permit definition associated with lodging places permit the multitude of structures, improvements and uses of the premises proposed by Terramor. In addition, nowhere in the Code, is there specific support for 75 permanent tents in the MDR Moderate-Density Zone. The number appears to be arbitrary and given the limits of 50 on the number of units for a Lodge, appears to be unwarranted and unauthorized. Indeed, given the definition of lodge under the Zoning Code, it is doubtful that the nonresidential structure called a lodge by Terramor satisfies
the definition of lodge under the Zoning Code.

While Terramor may argue that the additional structures and uses are accessory uses as defined in the Code, that argument is similarly without merit. The definitions of accessory uses are as follows: “Accessory use customarily incident to any uses listed herein, and on the same lot” and “Accessory use customarily incident to any of the uses listed herein, and NOT on the same lot.” Multiple residential buildings, a wellness tent, a swimming pool and wedding and special event venues, along with the multiple uses of the premises as proposed by Terramor, do not satisfy the definition of accessory use under the Saugerties Zoning Code.

In applying the Town Zoning Law to the Terramor Proposal, its application for a site plan approval and special use permit must be denied. At a minimum, given the serious questions as to whether Terramor’s application satisfies the requirements for a Special Use Permit (including whether the multiple structures and uses satisfy the definition of Accessory use) the application must be referred to the Zoning Board of Appeals for a determination before the application can proceed with Planning Board review.

In addition to the legal infirmities and questions as set forth above, there are numerous engineering and development shortcomings and issues which require a hard look at Terramor’s Proposal. Submitted along with this letter is correspondence from Sterling Environmental
Engineering, P.C. and principal Mark Millspaugh, detailing those concerns. As explained in Mr. Millspaugh’s analysis, a substantial amount of information is missing from the Terramor proposal and needs to be provided. Multiple approvals from multiple agencies are required, and thorough and detailed information must be provided by Terramor. Mr. Millspaugh has itemized missing information and items which need to be provided by Terramor, along with areas of concern for the Board’s consideration.

Given the lack of satisfactory information, we reserve the right to submit further comments and analysis once the missing information is received.

A copy of this letter is being submitted electronically to all Planning Board Members for their review and consideration as well.

Very truly yours,
O’Connell and Aronowitz
By : _________________
Daniel J. Tuczinski



And here is the letter from the engineer


July 19, 2022
Daniel J. Tuczinski, Esq. O’Connell & Aronowitz 54 State Street, 9th Floor Albany, New York 12207

Subject: Terramor Outdoor Resort, Saugerties, NY STERLING File #2022-49

Dear Mr. Tuczinski,

Sterling Environmental Engineering, P.C. (STERLING) has initiated a preliminary review of the Site Plan Application documents provided in support of the proposed Terramor Glamping project in the Town of Saugerties, New York. We offer the following preliminary comments.

General:
The proposed development is on two contiguous parcels totaling approximately 77 acres. The parcels will be combined into a single parcel in the MDR zone. The Zoning Code establishes permissible uses in the zone as set forth in the Schedule of Permittable Uses. A private Glamping facility is not an identified use of right. Lodging Places including “camps” are allowed subject to a Special Use Permit. This project as proposed appears to have multiple uses (i.e., a lodge with a restaurant, 75 camp sites, a house, employee dormitories). Clarity is needed to properly classify the use. Such may require a referral to the Zoning Board of Appeals (ZBA) for an interpretation. In addition to the general standards for Special Use Permits in §245-34, special standards for this use, described in §245-11, shall also be considered by the Planning Board in determining whether or not to grant the Special Use Permit. Additional information is needed to demonstrate the proposed project meets the required standards.

The term “camp” is not defined in the Code nor are minimum standards provided for this type of multiple use facility. Design standards need to be considered for density of development, layout, occupancy, etc.

The project documents provided for review do not contain an analysis supporting the proposed density of 75 camping units plus the employee housing, lodge building, reception center, restaurant/bar, pavilion, etc. Accordingly, we were not able to confirm the proposed development density is consistent within the MDR zone and the Town Comprehensive Plan.

The application does not contain an analysis of development constraints to support the proposed density of development. Development density authorized by Special Use Permit should not be of greater density than a development of single family residences in the MDR after deducting areas of steep slopes, wetlands, floodplain, etc. Not all of the 77 acres is developable.

The application documents do not include a business plan of the proposed development and its operations. Will the restaurant, bar, pool and other amenities be available to the public? Or will use of the facilities be restricted to the guests taking lodging at the facility? This requires clarification as it will affect the traffic projections and overall density of the development. It will also affect the water and wastewater projections.

Similarly, more information is needed on the nature of events to be held. Will events be limited only to the glamping guests? Or will day passes be issued to non campers to attend events?

Some development is proposed on steep slopes. Site roadways are proposed at 9-10% grades in some locations. Road profiles indicate that 10 feet of road embankment must be constructed in a jurisdictional wetland to access the site.Alternative road configurations should be evaluated to avoid wetland disturbance.

Site Plan Application Form:
The Site Plan Application Form incorrectly states a building footprint of 24,672 square feet. This is not consistent based on the architectural drawings set submitted with the Site Plan which indicates a total of approximately 60,000 square feet of buildings including the 75 glamping units. The total non-pervious surfaces stated on the application form also appear incorrect. Non-pervious surfaces include all paved areas and total building footprint.

Required Permits and Approvals:
Additional permitting and approvals are needed as follows: o Special Use Permit

  • Water and Wastewater permits needed from NYSDEC and UCDOH
  • NYSDEC and ACOE permits for stream disturbance and wetland Jurisdictional Determination
  • NYSDOT curb cut permit and sight distance review o SPDES discharge permit
  • SPDES construction general permit (Note: Coverage is not gained until all other permits and approvals are issued).

Additionally, an opinion may be required from the ZBA due to the multiple uses proposed. “Glamping” is not the same as Lodge, Camp and RV Park. It is not clear that glamping is consistent with lodging places eligible for a Special Use Permit.

Site Plan review pursuant to §245-33.C requires:

  • Grading and drainage plan including areas of disturbance; o Building plans, elevations and materials;
  • Location,type and screening details ofwaste disposalcontainers and outdoorstorage areas; o Traffic and circulation pattern, including pedestrian, golf cart, delivery and emergency vehicle circulation;
  • Landscaping plans;
  • Stormwater management plan; o Sign plan; and
  • Lighting plans.

A review of the submitted documents does not confirm that a traffic and circulation plan is provided. Further, the fire department should be consulted regarding access for emergency vehicles, parking restrictions, onsite water sources, etc.

Wastewater:
Regarding the plans for treatment of wastewater, a SPDES permit is needed from the NYSDEC to discharge treated effluent to the perennial stream located onsite. An analysis of the assimilative capacity of the stream to handle the wastewater discharge is necessary.

Additional analysis is also needed on the plans for water supply, including well yield testing and water quality testing to determine final treatment requirements. PFAS and PFOA have previously been detected in these wells. The design for the source, treatment and distribution systems needs to be submitted to the UCDOH for review and approval.

In addition to the above issues, the following additional items will need to be evaluated in accordance with SEQRA to determine potential significant environmental impacts.

Noise:
The following items will contribute to noise impacts, as the nearest residence is approximately 200 feet from the proposed development:

  • Dog park
  • Special events
  • Construction phase
  • Golf carts
  • Tree removal
  • Restaurant use on site
  • In consideration of the multiple uses and associated traffic, a noise study is warranted.

    Traffic:
    Recommendations to improve sight distance to the south include tree trimming and clearing south of the proposed site, shifting the 45-mph speed zone transition located near the site to a point 1,500 feet south of the site, and the installation of a radar speed feedback sign northbound in advance of the site. Additional analysis is needed to determine potential traffic impacts, especially with regard to events if additional staff is required. Traffic study made assumptions based on typical campgrounds that did not include staff.

    Alternative designs should be considered to reduce impacts to the jurisdictional wetland.

    Habitat:
    The Hudson Valley Resource Mapper indicates that the development area is a known important area for rare terrestrial animals, and contains wetlands and core forest that is important for sensitive wildlife.

    The site requires further investigations with respect to habitat for rare, threatened and endangered species.

    Air Quality, Odors:
    Wood campfires at the site will potentially negatively impact air quality at residences proximal to the site.

    Solid Waste:
    Impacts regarding solid waste will need evaluation. Measures should be considered to bear-proof onsite waste containers.

    Fire, Police, Emergency Medical Services:

    Impacts to these services need to be evaluated. Local officials must confirm that access is appropriate for emergency response.

    Stormwater Water Pollution Prevention Plan (SWPPP):
    The document provided to STERLING is incomplete. We will provide comments on the SWPPP separately.

    Please contact me if you have any questions or comments.

    Very truly yours,
    STERLING ENVIRONMENTAL ENGINEERING, P.C.
    Mark P. Millspaugh, P.E. President

Route 212 and Glasco Turnpike – A junction with more accidents than others

Terramor Catskils Traffic study crash history chart

Here are a couple of excerpts from the Terramor Catskills Traffic Impact Study submitted with all the other documents (available here):

  • At the intersection of NY Route 212 and Glasco Turnpike, there were 11 crashes that occurred over the studied period. Of these crashes, 5 resulted in injuries and 6 in property damage only. Right-Angle crashes occurred at a much higher rate than would be anticipated, accounting for 6 of the 11 crashes, and the crash rate was found to be 5.51 times higher than the state-wide average for comparable intersections.[…]
  • Along NY Route 212, from Old Route 212 to Glasco Turnpike, there were 10 crashes that occurred over the studied period. Of these crashes, 2 resulted in injuries and 8 in property damage only. Crashes involving animals or alcohol accounted for half of the crashes. The crash rate for the segment was found to be 2.23 times higher than the state-wide average for comparable roadway segments.[…]

And now we can add one more crash to the list. On Saturday July 16th there was a three-car accident at the junction of Route 212 and Glasco Turnpike in Shultis Cornes, West Saugerties. One of our own neighbors was involved in the accident. Here is her own post about it:


Posted to NextDoor Woodstock Saturday July 16th 2022 – From a screenshot captured 7:02pm

– starts–

Bonnie Monchik

Hi Everyone,

I was just involved in a pretty serious accident on Glasco and Rt 212, some of you may have heard about it. Three cars were involved, me being the luckiest as my car received the least impact.

There were no fatalities. One woman may have been hurt and understandably shaken up and was on a stretcher and taken by ambulance.

I am shaken up witnessing what could have been a fatal accident save for some higher grace. I am extremely grateful for myself, my dog and for the others including a little baby surviving this intact. A miracle.

Since this occurred several hours ago I have shared this with some friends. Three have already affirmed that they have had near accidents on this particular corner which leads me to my next plea.

I shudder to think what would happen should Terramor Glamping Resort be able to go through with their plan as proposed and unload tons of cars daily on to this already busy road and seriously dangerous nearby intersection.

The scope of their plan is unconscionable in this quiet residential neighborhood.
–ends–

We agree. The Terramor Catskills Traffic Impact Study even acknowledges the dangers of Route 212 in this area, suggesting a lowering of the speed limit and other traffic calming efforts. And that’s before we even get to the subject of sight-lines and cutting back neighbors foliage to get the required sightlines. Let’s not forget that this is a State Road. That means that there are several extra layers of administration, planning ad design to get through as compared to a Town Road. It’s much easier for the Saugerties Planning Board and the Town Highway Supervisor to dictate speed limits and traffic calming on Town Roads than on State Roads.

Here is a screenshot of the original post:

Traffic accident Route 212 and Glasco Turnpike Saugerties
Traffic accident Route 212 and Glasco Turnpike Saugerties

See the original page from the Terramor Traffic Impact Study here:
Image of Terramor Traffic study Crash history page 9
Image of Terramor Traffic study Crash history page 9

And here’s the .pdf of the relevant page:
Terramor Catskills – Traffic Study Crash history page 9

See the full Traffic Impact Study here: Terramor-July-5th-Application-07-Terramor-Catskills-TIS_ 6-23-22


Terramor Catskills SWPPP Submission Documents


As part of their submission to the Saugerties Planning Board, most of which can be seen here, Terramor was required to submit an SWPPP (Storm Water Pollution Prevention Plan). This is a very large document laying out all sorts of details of how the Terramor Catskills glamping project proposes to deal with water runoff from their development. This is an initial submission of the plan and will be examined by the Town engineer.

The SWPPP also contains extensive details of how construction will go, best practices for ponds, sediment control, etc. etc. etc. There is also a negative declaration from the State, saying that the site does not contain historical artifacts or areas of architectural importance. There is also a map showing that the terrain is not home to endangered species or an area of biological importance (although there is no letter indicating that).

For an idea of how complex this document is, here a few of the several pages showing tables of contents of a few sections:

Here are component parts of the first several sections of the report:

Pages 1 to 22 Storm Water Pollution Prevention Plan Including the following sections:
Table of Contents
1.0 PERMIT OVERVIEW AND REQUIREMENTS
1.1 PERMIT OVERVIEW
2.0 SWPPP REVIEW, UPDATE
2.1 SWPPP REVIEW
2.2 SWPPP UPDATE
3.0 SITE ASSESSMENT, EVALUATION AND PLANNING
3.1 PROJECT LOCATION
3.2 PRE-DEVELOPMENT CONDITIONS
3.3 PROJECT TYPE
3.4 PROJECT SCOPE
3.5 HISTORIC PRESERVATION DETERMINATION
3.6 RECEIVING WATERS
3.7 SOILS
4.0 EROSION AND SEDIMENT CONTROL
4.1 EROSION AND SEDIMENT CONTROL PRACTICES
4.2 EROSION AND SEDIMENT CONTROL DRAWINGS
4.3 CONSTRUCTION PHASING PLAN AND SEQUENCE OF OPERATIONS
4.4 EROSION AND SEDIMENT CONTROL PRACTICE MAINTENANCE
4.5 EROSION AND SEDIMENT CONTROL INSPECTION
4.6 CONTRACTOR SEQUENCE FORM
5.0 POST CONSTRUCTION STORMWATER MANAGEMENT PRACTICES
5.1 STORMWATER MANAGEMENT CONTROLS
5.2 GREEN INFRASTRUCTURE PRACTICES/RUNOFF REDUCTION TECHNIQUES
5.3 POST CONSTRUCTION STORMWATER MANAGEMENT D RAWINGS
5.4 HYDRAULIC AND HYDROLOGIC ANALYSIS
5.5 COMPARISON OF PRE AND POST CONSTRUCTION STORMWATER RUNOFF
6.0 POST CONSTRUCTION STORMWATER MAINTENANCE
6.1 MAINTENANCE TO BE PERFORMED
7.0 CONSTRUCTION WASTE
8.0 OFFSITE VEHICLE TRACKING
9.0 TEMPORARY STABILIZATION FOR FROZEN CONDITIONS
10.0 SPILL PREVENTION PRACTICES

——-
Pages 33 to 46 – Notice of Intent
——-
Pages 49 to 63 Stormwater Management Report Including the following sections:

1.0 INTRODUCTION
2.0 PROJECT DESCRIPTION
2.1 SITE LOCATION
2.2 PROJECT DESCRIPTION
2.3 SOIL CONDITIONS/SOIL TESTING
2.4 CURVE NUMBERS AND RAINFALL DATA
3.0 EXISTING CONDITIONS
4.0 PROPOSED CONDITIONS
5.0 NYSDEC DESIGN CRITERIA
5.1 SITE P LANNING TO PRESERVE NATURAL F EATURES
5.2 WATER QUALITY VOLUME (WQV)
5.3 RUNOFF REDUCTION VOLUME (RRV)
5.4 CHANNEL PROTECTION VOLUME (CPV)
5.5 OVERBANK FLOOD (QP) AND EXTREME FLOOD (QF) ATTENUATION
6.0 PROPOSED STORMWATER FACILITIES
6.1 PRETREATMENT
6.2 TREATMENT
7.0 POST-CONSTRUCTION MAINTENANCE REQUIREMENTS
7.0 REFERENCES

——-
Pages 65 to 99 Soil Report
——-
For more parts of the report Here is a very large Google Drive share of a pdf (92MB) of all the pictures I took. There are pages and pages of hydrological flow calculations and much more.
——-
The SWPPP also includes maps:
W1 Pre Development Watershed Map
W2 Pre Development Watershed Map
SK1 Soil Inventory
…and even an inventory of possible tree plantings:

Plant Schedule Terramor
Plant Schedule Terramor



NOTE: I am not an engineer. Naming conventions, technical details and much else may be correct, incorrect, or wildly off-topic.

About Terramor overdevelopment and the July 19th Saugerties Planning Board Meeting

Terramor Catskills Saugerties planning board meeting

NOTE: We’ve had some questions about the venue for the July 19th Saugerties Planning Board Meeting. The meeting will be in person at the Senior Center on Market Street near Cantine Field. (Map here).
As of July 18th at 12:43pm, the Town website had not been updated and still had outdated information on it. The Planning Board has tried to get the Town website updated, but it hadn’t happened yet.

Terramor Catskills is a large “glamping” project planned for a 77 acre parcel of land stretching from the northeast side of Route 212 near South Peak Vets, around to Cottontail Lane off Glasco Turnpike.

This subsidiary of KOA proposes 75 individual glamping tents. Each tent will be able to sleep between 2 and 5 people and will have its own bathroom and fire pit. The Terramor development will also feature a lodge with restaurant, a pool, grilling stations, an events pavilion, employee housing and various other facilities. The application contains a looped road crossing several wetlands, several wells, a septic treatment plant releasing treated water into a wetland, several parking lots, many stormwater ponds, and many hiking trails.

All of this will be described by the developers in their appearance at the Saugerties Planning Board on Tuesday July 19th, at the Senior Center on Market Street near Cantine Field (map here). The meeting starts at 7:30pm, but the Terramor project is part of “Old Business” and thus is unlikely to happen before 8:30pm. Realistically, it might be later.

NOTE: This is not the Public Hearing part of the process. That will happen at a different, later, meeting of the Saugerties Planning Board. The earliest that a Public Hearing could happen is August 16th.

This is a very large project in a quiet part of Saugerties. It requires careful examination and a lot of scrutiny. It is vital that concerned citizens show up in numbers at this first meeting. This shows the Board and the Terramor developers that community concerns must be taken seriously.

July 19th 2022 Saugerties Planning Board agenda retrieved July 11, 2022 - includes Terramor
July 19th 2022 Saugerties Planning Board agenda retrieved July 8 July 11, 2022 – includes Terramor (.pdf archived locally July 11th)

Again, while the public is encouraged to attend the meeting, this is NOT the time when members of the public will be able to stand up in front of the Board and air their own views. Members of the public *can* (and should) write to the Board to express their concerns about Terramor over development. If you write to the Board, send an electronic copy to Becky Bertorelli (BBertorelli@saugertiesny.gov), Recording Secretary, asking her to distribute to Board members. To make sure your letter is part of the public record, please say so expressly and particularly.

Terramor Catskills Resort makes official submission to Saugerties Planning Board – Documents within

Overall site Plan for Terramor Catskills Glamping Resort as submitted July 5th 2022

Here are the documents submitted to the Saugerties Planning Board by Terramor Catskills Resort. These were submitted by the July 5th deadline for the July 19th Planning Board meeting.

The submission consists of 10 documents, 8 of which are contained here. We hope to add the final two documents later. one of the missing documents (#1) is a cover letter, and thus not so important. The other missing document (#8) is a large SWPPP (Stormwater Management) document which we hope to access soon.

Documents are available in a variety of ways:
We have archived them locally on this site (see links below)
We have a Google Drive here: https://drive.google.com/drive/folders/1I7U4bM1e7wFXYMvHc6sqgeXZ48cL8Z1j?usp=sharing
We have a zip file containing all 8 files here (97.1 MB)

1) Cover letter

2) General Site Plan Application: Terramor-July-5th-Application-02-Terramor-Rev-Town-Site-Plan-App-7-1-22 (202KB)

3) Terramor Responses to NPV Sketch Plan Comment Terramor-July-5th-Application-03-Terramor-Responses-to NPV-3-14-22-Comments_7-1-22 (215KB) (NPV are the Town consultants. This document is a response to their initial comments, which you can see on this page)

4) This is the main application, with drawings, maps and the like. We have extracted the new site plan drawing/map just below.
Here is the full Terramor Plan as set July 1st and filed for the July 19th meeting:
http://southpeaknabe.com/wp-content/uploads/2022/07/Terramor-July-5th-Application-04-Terramor-Plan-Set_7-1-22.pdf
WARNING! VERY LARGE PDF FILE (83MB)

We have broken it up into smaller chunks below:

5) These are lighting details, with brochure: Terramor-July-5th-Application-05-Terramor-Lighting-Cut-Sheets-7-1-22 (4104KB)

6) Here is the Full Environmental Assessment Form Part 1: Terramor-July-5th-Application-06-Terramor-FEAF-Part 1_7-1-22 (3791KB)

7) Traffic Impact Study: Terramor-July-5th-Application-07-Terramor-Catskills-TIS_ 6-23-22 (7246KB)

8) SWPPP not yet available to us(Update: SWPPP details here)

9) Wastewater Report, including plans for wastewater treatment: Terramor-July-5th-Application-09-Wastewater-BOD-Report-7-1-22 (374KB) (BOD stands for “Biochemical Oxygen Demand” or “Biological Oxygen Demand” (USGS))

10)
A very basic memo about well water and distribution thereof: Terramor-July-5th-Application-10-Water-Supply-BOD-Report-7-1-22 (136KB)

These documents form the first basis for the Saugerties Planning Board to examine the development. The Board will also have input from their own Town Planner, consultants, and various other agencies. This is the beginning of a very long process.

Interested parties can use these documents to send letters to the Planning Board addressing technical (and philosophical) issues raised by the Terramor project, including potential claims of the trouble with Terramor over development.


Terramor Glamping Resort Catskill issues July 18th invite to concerned community and neighbors

Terramor invite July 18th 2022

Terramor invite July 18th 2022

Edited July 15th 2022
NOTE: If you can spare only one evening out of your week, please come to the Saugerties Planning Board Meeting on Tuesday the 19th. It is very important that we have many bodies in the room on Tuesday evening.
Click here to see more details about the Terramor appearance at the Saugerties Planning Board meeting on Tuesday July 19th
If you do decide to come on Monday, please eat the free food, listen carefully, and be skeptical.

Today, Monday July 11th, Terramor emailed an invite to many members of the community and concerned neighbours. The invite is for July 18th (the day before their formal presentation to the Saugerties Planning board.

This is an open invite. Even if you did not get an invite in your email (check spam and “Promotions” boxes), they say you are welcome to attend. Make sure to RSVP. One supposes that if a large number of folks respond, Terramor may have to move the event.

This will be a preview of the dog and pony show for the following night. But it should also include some new faces from their side. Possibly the manager of the Maine site also.

Given that we will not have the opportunity to ask questions of the engineers and developers at the Planning Board meeting the following night, this could be a good moment to acquire more knowledge and thus more points to use in our own approaches to the Planning Board.

Here is the text of the invite:

Dear Neighbors & Community Members,

Please join us on Monday, July 18, from 6:00 p.m. to 8:00 p.m. to learn more about our plan submittal to the Saugerties Planning Board.

While we had originally planned to host an informative meeting with you on July 26th, after the Town of Saugerties Planning Board had a chance to provide us feedback, we recognize there are some new concerns and unanswered questions from many of or our neighbors. In order to continue our transparent and open conversations, we want to review the plan submittal, discuss findings from our studies, and answer any questions or concerns you may have prior to the planning board meeting.

What to expect:

Review submitted plan
Major findings from studies: traffic, water, sewage, etc.
Operational forecast with tent density
Special events forecast & policies
Hear first hand from Terramor’s General Manager at our Bar Harbor location

Who is attending:

Ahmed Helmi – Real Estate Director
Jenny McCullough – Director, Brand & Operations
Henry Sirois – General Manager, Terramor Bar Harbor

Once again, the event will take place at Cucina. We will provide light appetizers, coffee and tea. Please RSVP to communityrelations@terramoroutdoorresort.com to ensure enough seating.

Hope to see you there,

Jenny McCullough
Director, Brand & Operations
Terramor Outdoor Resort



We are working on a post which includes documents from the formal Terramor submission to the Saugerties Planning Board. That post should be up later this evening, Monday July 11th.

Terramor glamping project formally added to Saugerties Planning board agenda for July 19th 2022

agenda

agenda
As expected, the Saugerties Planning Board has added Terramor to the agenda (opens in new tab) for the July 19th meeting. Agendas can, and do, change all the time. Go to the link above to see updated agenda.
July 19th 2022 Saugerties Planning Board agenda retrieved July 11, 2022 - includes Terramor
July 19th 2022 Saugerties Planning Board agenda retrieved July 8 July 11, 2022 – includes Terramor (.pdf archived locally July 11th)
The meeting will take place Tuesday July 19th at 7:30pm in the Frank D. Greco Memorial Senior Citizen Recreation Center, Cantine Memorial Field, 207 Market St, Saugerties, NY 12477

Please note that the Terramor glamping project is last in the “Old Business” section of the agenda. It is *possible* that the Board may move Terramor to the front of the Old Business section if they feel that there are so many members of the public there to hear the presentation. This move is not guaranteed, but it does happen.

The Saugerties Planning Board will hear a presentation from the Terramor engineers and developers. By the time of the meeting, the Board and its consultants should have started their examination of the submissions and all of the content in the public file. They should have their own questions about Terramor overdevelopment and the usual concerns about drainage, traffic, noise, septic, etc., etc.

While the public is encouraged to attend the meeting, this is NOT the time when members of the public will be able to stand up in front of the Board and air their own views. Members of the public *can* (and should) write to the Board to express their concerns about Terramor over development. If you write to the Board, send an electronic copy to Becky Bertorelli (BBertorelli@saugertiesny.gov), Recording Secretary, asking her to distribute to Board members. To make sure your letter is part of the public record, please say so expressly and particularly.

You can also write to individual Board members. We suggest an email to each person (or use BCC)

Fred Costello (Town Supervisor) fcostello@saugertiesny.gov
C. Howard Post (chowardpost@gmail.com) Chairperson
Carole Furman (octagon@hvc.rr.com) Vice Chair
Kevin Brady (kbrady@cerestechnologies.com)
Ken Goldberg (K2535@aol.com)
Michael Tiano (mmt92080@gmail.com)
Len Bouren (labouren@hotmail.com)
Robert Hlavaty (robertahlavaty@gmail.com)
William Creen (willcreen@yahoo.com)
Becky Bertorelli (BBertorelli@saugertiesny.gov) Recording Secretary

Here are the emails formatted for your BCC field using commas as separator:
fcostello@saugertiesny.gov, chowardpost@gmail.com, octagon@hvc.rr.com, kbrady@cerestechnologies.com, K2535@aol.com, mmt92080@gmail.com, labouren@hotmail.com, robertahlavaty@gmail.com, willcreen@yahoo.com, BBertorelli@saugertiesny.gov

Here are the emails formatted for your BCC field using semi-colons as separator:
fcostello@saugertiesny.gov; chowardpost@gmail.com; octagon@hvc.rr.com; kbrady@cerestechnologies.com; K2535@aol.com; mmt92080@gmail.com; labouren@hotmail.com; robertahlavaty@gmail.com; willcreen@yahoo.com; BBertorelli@saugertiesny.gov

We hope to have most of Terramor’s newly submitted documents up on this site soon. Probably by July 12th/13th